Search

What:
Where:   - In the title     
- In the annotation
- In keywords
Issue:
Author:
Rubric:
Number:
 

Author Title File Number Issue
O.M. Pihnastyi, G.K. Kozevnikov Discrete-eventing model of calculation of the duration of the production cycle of manufacturing a part of products Volume 46, № 2 Economics. Computer Science
O.M. Pihnastyi, V.D. Khodusov Optimal material flow control at the input of the main conveyor Volume 47 № 1 Economics. Computer Science

Articles 1 - 2 of 2
First | Prev. | 1 | Next | Last